2023~2020
2025
- 04 Installing POL / ISO Tank – TSE
2024
- 11 Installing C-Pentane Explosion Proof System – ICETRO
- 09 Installing ISO Supply Pump – SHINHUNG
2023
- 12 Installing Low Pressure Foaming Machine for Mediform – GENEWEL
- 09 Installing POL/ISO Storage Tanks – Samsung Poland
- 08 Installing High Pressure Foaming Machine for Icemaker – BLUENIX
- 07 Replacement of Old Chiller & Pipe Line – Lotte E&M
2022
- 11 Installing POL/ISO Storage Tank – Grand Woosung
- 06 Installing Discontinuous SANDWITCH PANEL manufacturing line in Philippines
- 06 REF A/B-LINE C-PENTANE Explosion-proof complementary construction in Samsung Kwangju Korea
- 03 Installing REF RA LINE PU Foaming M/C in Samsung Kwangju Korea
2021
- 10 Installing & Transferred installing REF PU Foaming M/C Full Line IN Bluenix Korea
- 04 Daeyoo Winia Korean Washing M/C Drum Line transferred Installation to Thailand
- 03 Installing REF DOOR PU Foaming M/C IN Samsung Vietnam
- 01 Installing RB LINE CABINET PU Foaming M/C in Samsung Kwangju Korea
2020
- 03 Installing Cabinet & Door Foaming machine in Samsung Uzbekistan
- 05 Installing & transfer of PU Foaming Full Line in DAEYOUNG E&B Korea
- 08 Modification REF DOOR PU Foaming M/C in Samsung Chennai India