PRODUCTS

PU Door Foaming Line

Category:

Description

PATERNOSTER TYPE

DRUM TYPE

PATERNOSTER TYPE

DESCRIPTIONS SPEC UNIT
NPL No. of Production Line   1 Line
NFx No. of Fixture 20 Set
Ct PU Cure Time 220 Sec.
NFs Service Fixture 5 Sec.
Hs 1 Hour  3,600 Sec.
Ef Efficiency  85% %
Sf Shift / Day  1 Shift
Yp1 Yearly Production / I shift 1,224,000 Ref./Year
Dp Daily Production / I Shift 4,080 Ref./Day
Hp Hourly Production 204 Ref./Hour
Tt Tact Time 15 Sec.
Wd Working Day 300 Day/Year
Wh Working Hour 10.0 Hour/Shift

DRUM TYPE

DESCRIPTIONS SPEC UNIT
NPL No. of Production Line  1 Line
NFx No. of Fixture 4~8 Set
Ct Mechanical Cycle Time 25 Sec
Hm Heating Method Water  
Mm Multiple Model Possible  
PLC PLC – Mitsubishi, Siemens, LS, others upon Request from User
  Injection Open or Close Mold
  Opening Parallel or Non Parallel
  Fast Pallet Changing System
  Option for Remote Diagnostics
  Panels Loading & Unloading by Automatic System

VIDEO

Door Foaming Line

FSR Door Foaming Line

Reviews

There are no reviews yet.

Be the first to review “PU Door Foaming Line”

Your email address will not be published. Required fields are marked *